Scheduling Piston Ring Manufacturing

Shorten Lead Times by Optimizing Bottleneck Processes

OEM Suppliers of very specific, specialized components usually face stiff competition because they are working in a narrow market. When the technology is well-established, and the production process itself is very mature, the next place to look for improving efficiency and reducing costs is in schedule optimization. Manufacturers of piston rings for automotive assembly face the challenge of scheduling and sequencing the multiple grinding processes, the large number of processes involved, and the frequent bottlenecks.

  • Highest level of process synchronization
  • Reduced lead times and inventory stocks
  • Reliable on-time delivery
  • Drastic reduction in the time and effort needed for planning

Challenges

With the many processes involved—from machining, to tensioning, coating, quality inspection, and others—buildup of work-in-process inventory is a problem. These processes can also include multiple bottlenecks, and manual optimal planning becomes a monumental undertaking.

Considering the large number of constraints between these processes, including changeover times and individual resource efficiencies, it is hard to react optimally when a change suddenly happens, such as a rush order coming in, or urgent machinery maintenance.

With Asprova APS

  • Manage every constraint that affects your schedule
  • Meet more delivery targets
  • Reduce lead times with bottleneck-oriented planning
  • Reduce inventory of intermediate items
  • Increased resource efficiency
  • Improved transparency in factory and order status
  • Respond with ease to changes such as rush orders, machine failures, and others