Process Synchronization through Optimal, Sequential Scheduling
PVC sheet production involves a long and complex production process, throughout which numerous cooling phases are scattered. The biggest challenge lies in synchronizing make-to-order processes with batch production processes.
Holistic process synchronization
Minimized lead times and inventory stocks
Flawless delivery reliability
Reduced time and effort spent on planning
Requirements to Asprova
Deliver final goods sooner
Holistic process synchronization through optimal sequential scheduling
Drastically shortened production lead times through bottleneck-oriented planning
Massive reduction in intermediate parts
Increased resource efficiency
Improved transparency in factory and order status
Greater flexibility in case of order changes, rush orders, machine failure, etc.
90% reduction in planning efforts
Result with Asprova APS
Shorter Deliver Times
Holistic Process Synchronization through Optimal, Sequential Scheduling
Drastically Shortened Production Lead Times through Bottleneck-Oriented Planning
Massive Reduction in Intermediate Parts
Increased Resource Efficiency
Improved Transparency in Factory and Order Status
Greater Flexibility in the Case of Order Changes, Rush Orders, Machine Failure, etc.